Replacing old railway bridge, Kotka 2013

The old railway bridge in Kotka was replaced with a new one. Total weight 90-100t.

The bridge had to be flame-cut to six pieces before lifting. The lift was accomplished with our new mobile crane Liebherr LTM 1200-5.1.

Used fleet

Liebherr LTM 1200-5.1Lift capacity 200 tMain boom 72,00 mBoom extension 36,00 mDownload Brochure

Please ask for a quote

Juha Turunen

Kouvola | Kuusankoski

Technical Manager
Henkilö voi palvella seuraavilla kielilläFinnishEnglish

Subscribe to our newsletter

Get up-to-date information on our services.


© E. Helaakoski 2022